| Section |
Download in PDF format |
|
| Chairman's Foreword |
Chairman's Foreword and readers guide (1207 kb, 172 seconds to download, 56k modem) |
| Readers guide |
| |
Introduction |
| |
Structure of the plan |
| |
Abbreviations and symbols |
| |
Relationships between rules and resource consents |
| |
Activity guide |
|
| 1 |
Approaches to resource management |
Chapter 1: Approaches to resource management (145 kb, 20 seconds to download, 56k modem) |
| |
1.1 |
Introduction |
| |
1.2 |
Approaches to resource management |
| |
1.3 |
Monitoring the effectiveness of the plan |
| |
1.4 |
Review of the plan |
| |
1.5 |
Processes to address cross-boundary issues |
| |
1.6 |
Responsibilities of resource users under the RMA |
|
| 2 |
Matters of significance to Maori |
Chapter 2: Matters of significance to Maori (162 kb, 23 seconds to download, 56k modem) |
| |
2.1 |
Introduction |
| |
2.2 |
Iwi in the Waikato region |
| |
2.3 |
Tangata Whenua relationship with natural and physical resources |
|
| 3 |
Water module |
Chapter 3: Water module (1915 kb, 273 seconds to download, 56k modem) |
| |
3.1 |
Water resources |
| |
3.2 |
Water management classes |
| |
3.3 |
Water takes |
| |
3.4 |
Efficient use of water |
| |
3.5 |
Discharges |
| |
3.6 |
Damming and diverting |
| |
3.7 |
Wetlands |
| |
3.8 |
Drilling |
| |
3.9 |
Non-point source discharges |
|
| 4 |
River and lake bed module |
Chapter 4: River and lake bed module (1581 kb, 225 seconds to download, 56k modem) |
| |
4.1 |
River and lake bed management |
| |
4.2 |
River and lake bed structures |
| |
4.3 |
River and lake bed disturbances |
| |
4.4 |
Lake Taupo mooring maps |
|
| 5 |
Land and soil module |
Chapter 5: Land and soil module (607 kb, 86 seconds to download, 56k modem) |
| |
5.1 |
Accelerated erosion |
| |
5.2 |
Discharges onto or into land |
| |
5.3 |
Contaminated land |
|
| 6 |
Air module |
Chapter 6: Air module (597 kb, 85 seconds to download, 56k modem) |
| |
6.1 |
Regional and local air management |
| |
6.2 |
The discharge of agrichemicals into air |
| |
6.3 |
Regional ambient air guidelines |
| |
6.4 |
Guidelines for assessment |
|
| 7 |
Geothermal module |
|
| |
|
This section is not included in this version of the plan as it is the subject of Proposed Waikato Regional Plan: Proposed Variation No. 2 (Operative). |
You can download a copy of the variation below:
Variation No.2 – Geothermal Module - with no maps (see pdfs below for the geothermal maps) (272 kb, 38 seconds to download, 56k modem)
Variation No.2 - Geothermal Module - maps of geothermal systems (1219 kb, 174 seconds to download, 56k modem)
Variation No. 2 Geothermal Module - maps of significant geothermal features and geothermal water features (2588 kb, 369 seconds to download, 56k modem) |
|
| 8 |
Information requirements |
Chapter 8: Information requirements (102 kb, 14 seconds to download, 56k modem) |
| |
8.1 |
Assessment criteria and information requirements |
|
| Glossary |
Glossary (182 kb, 26 seconds to download, 56k modem) |
|
| Maps |
Maps are provided on CD ROM with printed copies of this plan. Maps are also available to view at a scale of 1:50,000 at the Hamilton office of Environment Waikato (401 Grey Street, Hamilton East). Copies of maps, at any scale, can be purchased on request. |
|